Thursday, July 8, 2010

Framed, Sheetrocked and More

They are moving so fast with our new house. They have framed, sheet rocked, bricked the exterior, put the roof on, taped and bedded, mudded the walls (I know, I watch too much HGTV!), installed the interior doors, painted the walls and trim, put the cabinets and island in, installed the stone on the fireplace and all of the closets have rods and shelves......whew! They move fast!! We drove by yesterday and there were two AC units and there was a piece of granite with two circles cut out so I am sure that by today, they have installed the granite!! I will take pictures of the latest installations inside and post them later but here are some of the framing, sheet rocking and bricked house.

I think it is good luck that the air compressor they are using for our house is named "Jenny"
I was surprised to see how many people they had working on framing the house

1st floor front view

1st floor back view

2nd floor


Added the roof, view from the back


Completed frame and added windows


The master bedroom window (I just love it!)


Roofing begins. Those are the roof shingles in a bunch of bags on the roof and that guy is walking around casually all the way up there. The kids got a kick out of that!


I thought it was interesting to watch them walk around on the roof!Roofing is done.....


.....and brick work begins


Close up of my brick (I love that too!)


Finished brick (I love the detail)


Back view of the completed brick